2007 |
7 | EE | Cédric Pessan,
Jean-Louis Bouquard,
Emmanuel Néron:
Genetic Branch-and-Bound or Exact Genetic Algorithm?.
Artificial Evolution 2007: 136-147 |
2006 |
6 | EE | Jean-Louis Bouquard,
Christophe Lenté:
Two-machine flow shop scheduling problems with minimal and maximal delays.
4OR 4(1): 15-28 (2006) |
5 | EE | Jean-Louis Bouquard,
Christophe Lenté,
Jean-Charles Billaut:
Application of an optimization problem in Max-Plus algebra to scheduling problems.
Discrete Applied Mathematics 154(15): 2064-2079 (2006) |
2005 |
4 | EE | Cyril Canon,
Jean-Charles Billaut,
Jean-Louis Bouquard:
Dimensioning an Inbound Call Center Using Constraint Programming.
CP 2005: 841 |
3 | EE | Vincent T'Kindt,
Jean-Charles Billaut,
Jean-Louis Bouquard,
Christophe Lenté,
Patrick Martineau,
Emmanuel Néron,
Christian Proust,
C. Tacquard:
The e-OCEA project: towards an Internet decision system for scheduling problems.
Decision Support Systems 40(2): 329-337 (2005) |
2 | EE | Ph. Mauguière,
Jean-Charles Billaut,
Jean-Louis Bouquard:
New Single Machine and Job-Shop Scheduling Problems with Availability Constraints.
J. Scheduling 8(3): 211-231 (2005) |
1 | EE | Jean-Louis Bouquard,
Jean-Charles Billaut,
Mikhail A. Kubzin,
Vitaly A. Strusevich:
Two-machine flow shop scheduling problems with no-wait jobs.
Oper. Res. Lett. 33(3): 255-262 (2005) |