2009 |
6 | EE | Shih-Wei Lin,
Kuo-Ching Ying,
Zne-Jung Lee:
Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times.
Computers & OR 36(4): 1110-1121 (2009) |
2008 |
5 | EE | Zne-Jung Lee,
Shih-Wei Lin,
Kuo-Ching Ying:
A Dynamical Ant Colony Optimization with Heuristics for Scheduling Jobs on a Single Machine with a Common Due Date.
Metaheuristics for Scheduling in Industrial and Manufacturing Applications 2008: 91-103 |
4 | EE | Shih-Wei Lin,
Kuo-Ching Ying,
Shih-Chieh Chen,
Zne-Jung Lee:
Particle swarm optimization for parameter determination and feature selection of support vector machines.
Expert Syst. Appl. 35(4): 1817-1824 (2008) |
2007 |
3 | EE | Zne-Jung Lee,
Chen-Chia Chuang,
Kuo-Ching Ying:
An Intelligent Algorithm for Scheduling Jobs on a Single Machine with a Common Due Date.
KES (2) 2007: 689-695 |
2 | EE | Shih-Wei Lin,
Shuo-Yan Chou,
Kuo-Ching Ying:
A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date.
European Journal of Operational Research 177(2): 1294-1301 (2007) |
2004 |
1 | EE | Kuo-Ching Ying,
Ching-Jong Liao:
An ant colony system for permutation flow-shop sequencing.
Computers & OR 31(5): 791-801 (2004) |