2008 |
8 | EE | Dar-Li Yang,
Chou-Jung Hsu,
Wen-Hung Kuo:
A two-machine flowshop scheduling problem with a separated maintenance constraint.
Computers & OR 35(3): 876-883 (2008) |
7 | EE | Dar-Li Yang,
Wen-Hung Kuo,
Maw-Sheng Chern:
Multi-family scheduling in a two-machine reentrant flow shop with setups.
European Journal of Operational Research 187(3): 1160-1170 (2008) |
6 | EE | Wen-Hung Kuo,
Dar-Li Yang:
Parallel-machine scheduling with time dependent processing times.
Theor. Comput. Sci. 393(1-3): 204-210 (2008) |
2007 |
5 | EE | Wen-Hung Kuo,
Dar-Li Yang:
Single machine scheduling with past-sequence-dependent setup times and learning effects.
Inf. Process. Lett. 102(1): 22-26 (2007) |
2006 |
4 | EE | Wen-Hung Kuo,
Dar-Li Yang:
Single-machine group scheduling with a time-dependent learning effect.
Computers & OR 33: 2099-2112 (2006) |
3 | EE | Wen-Hung Kuo,
Dar-Li Yang:
Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect.
European Journal of Operational Research 174(2): 1184-1190 (2006) |
2 | EE | Wen-Hung Kuo,
Dar-Li Yang:
Minimizing the makespan in a single machine scheduling problem with a time-based learning effect.
Inf. Process. Lett. 97(2): 64-67 (2006) |
2000 |
1 | EE | Dar-Li Yang,
Maw-Sheng Chern:
Two-machine flowshop group scheduling problem.
Computers & OR 27(10): 975-985 (2000) |