2008 | ||
---|---|---|
8 | EE | Dar-Li Yang, Chou-Jung Hsu, Wen-Hung Kuo: A two-machine flowshop scheduling problem with a separated maintenance constraint. Computers & OR 35(3): 876-883 (2008) |
7 | EE | Dar-Li Yang, Wen-Hung Kuo, Maw-Sheng Chern: Multi-family scheduling in a two-machine reentrant flow shop with setups. European Journal of Operational Research 187(3): 1160-1170 (2008) |
6 | EE | Wen-Hung Kuo, Dar-Li Yang: Parallel-machine scheduling with time dependent processing times. Theor. Comput. Sci. 393(1-3): 204-210 (2008) |
2007 | ||
5 | EE | Wen-Hung Kuo, Dar-Li Yang: Single machine scheduling with past-sequence-dependent setup times and learning effects. Inf. Process. Lett. 102(1): 22-26 (2007) |
2006 | ||
4 | EE | Wen-Hung Kuo, Dar-Li Yang: Single-machine group scheduling with a time-dependent learning effect. Computers & OR 33: 2099-2112 (2006) |
3 | EE | Wen-Hung Kuo, Dar-Li Yang: Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect. European Journal of Operational Research 174(2): 1184-1190 (2006) |
2 | EE | Wen-Hung Kuo, Dar-Li Yang: Minimizing the makespan in a single machine scheduling problem with a time-based learning effect. Inf. Process. Lett. 97(2): 64-67 (2006) |
1999 | ||
1 | EE | Wen-Hung Kuo: The development of a human-computer interactive scheduling system. Int. J. Computer Integrated Manufacturing 12(2): 156-167 (1999) |
1 | Maw-Sheng Chern | [7] |
2 | Chou-Jung Hsu | [8] |
3 | Dar-Li Yang | [2] [3] [4] [5] [6] [7] [8] |