![]() | ![]() |
2009 | ||
---|---|---|
7 | EE | Chien-Wei Wu: Decision-making in testing process performance with fuzzy data. European Journal of Operational Research 193(2): 499-509 (2009) |
2008 | ||
6 | EE | Chien-Wei Wu: Assessing process capability based on Bayesian approach with subsamples. European Journal of Operational Research 184(1): 207-228 (2008) |
5 | EE | Chien-Wei Wu, W. L. Pearn: A variables sampling plan based on C. European Journal of Operational Research 184(2): 549-560 (2008) |
4 | EE | Y. C. Chang, Chien-Wei Wu: Assessing process capability based on the lower confidence bound of Cpk for asymmetric tolerances. European Journal of Operational Research 190(1): 205-227 (2008) |
2006 | ||
3 | EE | W. L. Pearn, Chien-Wei Wu: Production quality and yield assurance for processes with multiple independent characteristics. European Journal of Operational Research 173(2): 637-647 (2006) |
2 | EE | W. L. Pearn, Y. C. Chang, Chien-Wei Wu: Multiple-process performance analysis chart based on process loss indices. Int. J. Systems Science 37(7): 429-435 (2006) |
2005 | ||
1 | EE | W. L. Pearn, Chien-Wei Wu: A Bayesian approach for assessing process precision based on multiple samples. European Journal of Operational Research 165(3): 685-695 (2005) |
1 | Y. C. Chang | [2] [4] |
2 | W. L. Pearn | [1] [2] [3] [5] |