2009 |
8 | EE | Haldun Süral,
Meltem Denizel,
Luk N. Van Wassenhove:
Lagrangean relaxation based heuristics for lot sizing with setup times.
European Journal of Operational Research 194(1): 51-63 (2009) |
2005 |
7 | EE | Andreas Robotis,
Shantanu Bhattacharya,
Luk N. Van Wassenhove:
The effect of remanufacturing on procurement decisions for resellers in secondary markets.
European Journal of Operational Research 163(3): 688-705 (2005) |
6 | EE | H. A. J. Crauwels,
C. N. Potts,
Dirk Van Oudheusden,
Luk N. Van Wassenhove:
Branch and Bound Algorithms for Single Machine Scheduling with Batching to Minimize the Number of Late Jobs.
J. Scheduling 8(2): 161-177 (2005) |
2004 |
5 | EE | Marc Le Menestrel,
Luk N. Van Wassenhove:
Ethics outside, within, or beyond OR models?
European Journal of Operational Research 153(2): 477-484 (2004) |
2003 |
4 | EE | Henk Akkermans,
Paul Bogerd,
Enver Yücesan,
Luk N. Van Wassenhove:
The impact of ERP on supply chain management: Exploratory findings from a European Delphi study.
European Journal of Operational Research 146(2): 284-301 (2003) |
2001 |
3 | EE | Enver Yücesan,
Luk N. Van Wassenhove,
Klenthis Papanikas,
Nico M. van Dijk:
On-line error bounds for steady-state approximations: a potential solution to the initialization bias problem.
Winter Simulation Conference 2001: 460-469 |
1996 |
2 | EE | R. P. A. Nuyens,
Nico M. van Dijk,
Luk N. Van Wassenhove,
Enver Yücesan:
An experimental analysis of steady state convergence in simple queueing systems: Implications for flexible manufacturing system models.
Simul. Pr. Theory 4(1): 1-29 (1996) |
1990 |
1 | EE | T. S. Abdul-Razaq,
C. N. Potts,
Luk N. Van Wassenhove:
A survey of algorithms for the single machine total weighted tardiness scheduling problem.
Discrete Applied Mathematics 26(2-3): 235-253 (1990) |