2005 | ||
---|---|---|
4 | EE | H. A. J. Crauwels, C. N. Potts, Dirk Van Oudheusden, Luk N. Van Wassenhove: Branch and Bound Algorithms for Single Machine Scheduling with Batching to Minimize the Number of Late Jobs. J. Scheduling 8(2): 161-177 (2005) |
1991 | ||
3 | EE | A. M. A. Hariri, C. N. Potts: Heuristics for scheduling unrelated parallel machines. Computers & OR 18(3): 323-331 (1991) |
2 | EE | C. N. Potts: Scheduling two job classes on a single machine. Computers & OR 18(5): 411-415 (1991) |
1990 | ||
1 | EE | T. S. Abdul-Razaq, C. N. Potts, Luk N. Van Wassenhove: A survey of algorithms for the single machine total weighted tardiness scheduling problem. Discrete Applied Mathematics 26(2-3): 235-253 (1990) |
1 | T. S. Abdul-Razaq | [1] |
2 | H. A. J. Crauwels | [4] |
3 | A. M. A. Hariri | [3] |
4 | Dirk Van Oudheusden | [4] |
5 | Luk N. Van Wassenhove | [1] [4] |