2008 |
10 | EE | Chiang Kao,
Wann-Yih Wu,
Wen-Jen Hsieh,
Tai-Yue Wang,
Chinho Lin,
Liang-Hsuan Chen:
Measuring the national competitiveness of Southeast Asian countries.
European Journal of Operational Research 187(2): 613-628 (2008) |
9 | EE | Tai-Yue Wang,
Jui-Ming Hu:
An inventory control system for products with optional components under service level and budget constraints.
European Journal of Operational Research 189(1): 41-58 (2008) |
8 | EE | Tai-Yue Wang,
Chien-Yu Huang:
Optimizing back-propagation networks via a calibrated heuristic algorithm with an orthogonal array.
Expert Syst. Appl. 34(3): 1630-1641 (2008) |
2007 |
7 | EE | Tai-Yue Wang,
Chien-Yu Huang:
Improving forecasting performance by employing the Taguchi method.
European Journal of Operational Research 176(2): 1052-1065 (2007) |
6 | EE | Tai-Yue Wang,
Chien-Yu Huang:
Applying optimized BPN to a chaotic time series problem.
Expert Syst. Appl. 32(1): 193-200 (2007) |
5 | EE | Tai-Yue Wang,
Huei-Min Chiang:
Fuzzy support vector machine for multi-class text categorization.
Inf. Process. Manage. 43(4): 914-929 (2007) |
2006 |
4 | EE | Tai-Yue Wang,
Yih-Hwang Yang,
Hern-Jiang Lin:
Comparison of Scheduling Efficiency in Two/Three-Machine no-Wait Flow Shop Problem Using Simulated Annealing and Genetic Algorithm.
APJOR 23(1): 41-59 (2006) |
2001 |
3 | EE | Tai-Yue Wang,
Jun-Yi Song,
Long-Hui Chen:
The economic justification of machine changeover time reduction in a manufacturing cell.
Int. J. Computer Integrated Manufacturing 14(4): 409-420 (2001) |
1999 |
2 | EE | Tai-Yue Wang,
Kuei-Bin Wu:
A parameter set design procedure for the simulated annealing algorithm under the computational time constraint.
Computers & OR 26(7): 665-678 (1999) |
1998 |
1 | EE | Tai-Yue Wang,
Jun-Yi Song:
The economic justification of setup time reduction under variable demand.
Int. J. Systems Science 29(9): 1019-1026 (1998) |