2006 | ||
---|---|---|
1 | EE | Tai-Yue Wang, Yih-Hwang Yang, Hern-Jiang Lin: Comparison of Scheduling Efficiency in Two/Three-Machine no-Wait Flow Shop Problem Using Simulated Annealing and Genetic Algorithm. APJOR 23(1): 41-59 (2006) |
1 | Tai-Yue Wang | [1] |
2 | Yih-Hwang Yang | [1] |