![]() | ![]() |
2008 | ||
---|---|---|
2 | EE | Binggang Wang, Yunqing Rao, Xinyu Shao, Mengchang Wang: Sequencing Mixed-Model Assembly Lines with Limited Intermediate Buffers by a GA/SA-Based Algorithm. ICIC (3) 2008: 15-22 |
1 | EE | Binggang Wang, Yunqing Rao, Xinyu Shao, Mengchang Wang: Scheduling Mixed-Model Assembly Lines with Cost Objectives by a Hybrid Algorithm. ICIRA (2) 2008: 378-387 |
1 | Yunqing Rao | [1] [2] |
2 | Xinyu Shao | [1] [2] |
3 | Mengchang Wang | [1] [2] |