![]() |
| 2009 | ||
|---|---|---|
| 1 | EE | Adam Janiak, Tomasz Krysiak, Costas P. Pappis, Theodore G. Voutsinas: A scheduling problem with job values given as a power function of their completion times. European Journal of Operational Research 193(3): 836-848 (2009) |
| 1 | Adam Janiak | [1] |
| 2 | Tomasz Krysiak | [1] |
| 3 | Costas P. Pappis | [1] |