2009 | ||
---|---|---|
3 | EE | Adam Janiak, Tomasz Krysiak, Costas P. Pappis, Theodore G. Voutsinas: A scheduling problem with job values given as a power function of their completion times. European Journal of Operational Research 193(3): 836-848 (2009) |
2007 | ||
2 | EE | Adam Janiak, Tomasz Krysiak: Single processor scheduling with job values depending on their completion times. J. Scheduling 10(2): 129-138 (2007) |
2004 | ||
1 | EE | Adam Janiak, Tomasz Krysiak: Multiprocessor Scheduling Problem with Stepwise Model of Job Value Change. OR 2004: 352-359 |
1 | Adam Janiak | [1] [2] [3] |
2 | Costas P. Pappis | [3] |
3 | Theodore G. Voutsinas | [3] |