2009 | ||
---|---|---|
3 | EE | Arvind Kumar, Balachandran Vaidyanathan, Krishna C. Jha, Ravindra K. Ahuja: Railroad Crew Scheduling. Encyclopedia of Optimization 2009: 3227-3236 |
2 | EE | Arvind Kumar, Balachandran Vaidyanathan, Ravindra K. Ahuja: Railroad Locomotive Scheduling. Encyclopedia of Optimization 2009: 3236-3245 |
2007 | ||
1 | EE | Balachandran Vaidyanathan, Krishna C. Jha, Ravindra K. Ahuja: Multicommodity network flow approach to the railroad crew-scheduling problem. IBM Journal of Research and Development 51(3/4): 325-344 (2007) |
1 | Ravindra K. Ahuja | [1] [2] [3] |
2 | Krishna C. Jha | [1] [3] |
3 | Arvind Kumar | [2] [3] |