![]() | ![]() |
2008 | ||
---|---|---|
4 | EE | Chachrist Srisuwanrat, Photios G. Ioannou, Omer Tsimhoni: Simulation and optimization for construction repetitive projects using promodel and simrunner. Winter Simulation Conference 2008: 2402-2412 |
2007 | ||
3 | EE | Photios G. Ioannou, Chachrist Srisuwanrat: Optimal work breaks in deterministic and probabilistic repetitive projects. Winter Simulation Conference 2007: 2141-2150 |
2 | EE | Chachrist Srisuwanrat, Photios G. Ioannou: Optimal scheduling of probabilistic repetitive projects using completed unit and genetic algorithms. Winter Simulation Conference 2007: 2151-2158 |
2006 | ||
1 | EE | Photios G. Ioannou, Chachrist Srisuwanrat: Sequence step algorithm for continuous resource utilization in probabilistic repetitive projects. Winter Simulation Conference 2006: 1731-1740 |
1 | Photios G. Ioannou | [1] [2] [3] [4] |
2 | Omer Tsimhoni | [4] |