2009 |
16 | EE | Wen-Ying Wang,
Shey-Huei Sheu,
Yan-Chun Chen,
Der-Juinn Horng:
Economic optimization of off-line inspection with rework consideration.
European Journal of Operational Research 194(3): 807-813 (2009) |
15 | EE | Gwo-Liang Liao,
Yen Hung Chen,
Shey-Huei Sheu:
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance.
European Journal of Operational Research 195(2): 348-357 (2009) |
2008 |
14 | EE | Jau-Chuan Ke,
Ming Yang Ko,
Shey-Huei Sheu:
Estimation comparison on busy period for a controllable M/G/1 system with bicriterion policy.
Simulation Modelling Practice and Theory 16(6): 645-655 (2008) |
2006 |
13 | EE | Yu-Hung Chien,
Shey-Huei Sheu:
Extended optimal age-replacement policy with minimal repair of a system subject to shocks.
European Journal of Operational Research 174(1): 169-181 (2006) |
12 | EE | Yu-Hung Chien,
Shey-Huei Sheu,
Zhe George Zhang,
Ernie Love:
An extended optimal replacement model of systems subject to shocks.
European Journal of Operational Research 175(1): 399-412 (2006) |
2005 |
11 | EE | Shey-Huei Sheu,
Yu-Hung Chien:
Optimal burn-in time to minimize the cost for general repairable products sold under warranty.
European Journal of Operational Research 163(2): 445-461 (2005) |
10 | EE | Shey-Huei Sheu,
Yuh-Bin Lin,
Gwo-Liang Liao:
Optimal policies with decreasing probability of imperfect maintenance.
IEEE Transactions on Reliability 54(2): 347-357 (2005) |
2004 |
9 | EE | Shey-Huei Sheu,
Yu-Hung Chien:
Optimal age-replacement policy of a system subject to shocks with random lead-time.
European Journal of Operational Research 159(1): 132-144 (2004) |
8 | EE | Shey-Huei Sheu,
Yu-Hung Chien:
Minimizing cost-functions related to both burn-in and field-operation under a generalized model.
IEEE Transactions on Reliability 53(3): 435-439 (2004) |
2003 |
7 | EE | Chih-Hsiung Wang,
Shey-Huei Sheu:
Determining the optimal production-maintenance policy with inspection errors: using a Markov chain.
Computers & OR 30(1): 1-17 (2003) |
6 | EE | Chih-Hsiung Wang,
Shey-Huei Sheu:
Optimal lot sizing for products sold under free-repair warranty.
European Journal of Operational Research 149(1): 131-141 (2003) |
2001 |
5 | EE | Chih-Hsiung Wang,
Shey-Huei Sheu:
Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system.
Computers & OR 28(11): 1093-1110 (2001) |
2000 |
4 | EE | Jhy-Ping Jhang,
Shey-Huei Sheu:
Optimal age and block replacement policies for a multi-component system with failure interaction.
Int. J. System Science 31(5): 593-603 (2000) |
1998 |
3 | EE | Shey-Huei Sheu,
Jhy-Ping Jhang:
Optimal age and block replacement policies for a multi-component system with a shock type failure interaction.
Int. J. Systems Science 29(8): 805-817 (1998) |
1997 |
2 | EE | Shey-Huei Sheu:
An optimal ordering policy of a system subject to shocks.
Int. J. Systems Science 28(3): 241-247 (1997) |
1 | EE | Shey-Huei Sheu:
A generalized model for jointly determining the optimal ordering point and the optimal number of minimal repairs before replacement.
Int. J. Systems Science 28(8): 759-766 (1997) |