![]() |
| 2008 | ||
|---|---|---|
| 3 | EE | Emmanuel Jeannot, Erik Saule, Denis Trystram: Bi-objective Approximation Scheme for Makespan and Reliability Optimization on Uniform Parallel Machines. Euro-Par 2008: 877-886 |
| 2 | EE | Erik Saule, Pierre-François Dutot, Grégory Mounié: Scheduling with storage constraints. IPDPS 2008: 1-8 |
| 2007 | ||
| 1 | EE | Jack Dongarra, Emmanuel Jeannot, Erik Saule, Zhiao Shi: Bi-objective scheduling algorithms for optimizing makespan and reliability on heterogeneous systems. SPAA 2007: 280-288 |
| 1 | Jack Dongarra | [1] |
| 2 | Pierre-François Dutot | [2] |
| 3 | Emmanuel Jeannot | [1] [3] |
| 4 | Grégory Mounié (Gregory Mounie) | [2] |
| 5 | Zhiao Shi | [1] |
| 6 | Denis Trystram | [3] |