![]() | ![]() |
2005 | ||
---|---|---|
1 | EE | Cherif Sadfi, Bernard Penz, Christophe Rapine, Jacek Blazewicz, Piotr Formanowicz: An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. European Journal of Operational Research 161(1): 3-10 (2005) |
1 | Jacek Blazewicz | [1] |
2 | Piotr Formanowicz | [1] |
3 | Bernard Penz | [1] |
4 | Christophe Rapine | [1] |