2005 | ||
---|---|---|
2 | EE | Cherif Sadfi, Bernard Penz, Christophe Rapine, Jacek Blazewicz, Piotr Formanowicz: An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. European Journal of Operational Research 161(1): 3-10 (2005) |
2000 | ||
1 | Jacek Blazewicz, Frédéric Guinand, Bernard Penz, Denis Trystram: Scheduling Complete Trees on Two Uniform Processors with Integer Speed Ratios and Communication Delays. Parallel Processing Letters 10(4): 267-278 (2000) |
1 | Jacek Blazewicz | [1] [2] |
2 | Piotr Formanowicz | [2] |
3 | Frédéric Guinand | [1] |
4 | Christophe Rapine | [2] |
5 | Cherif Sadfi | [2] |
6 | Denis Trystram | [1] |