2007 |
9 | EE | Tinglong Dai,
Xiangtong Qi:
An acquisition policy for a multi-supplier system with a finite-time horizon.
Computers & OR 34(9): 2758-2773 (2007) |
8 | EE | Xiangtong Qi:
A note on worst-case performance of heuristics for maintenance scheduling problems.
Discrete Applied Mathematics 155(3): 416-422 (2007) |
7 | EE | Xiangtong Qi:
Order splitting with multiple capacitated suppliers.
European Journal of Operational Research 178(2): 421-432 (2007) |
2006 |
6 | EE | Jianping Wang,
Xiangtong Qi,
Mei Yang:
Routing and wavelength assignment for core-based tree in WDM networks.
Computer Communications 29(11): 1896-1904 (2006) |
5 | EE | Xiangtong Qi,
Jonathan F. Bard:
Generating labor requirements and rosters for mail handlers using simulation and optimization.
Computers & OR 33: 2645-2666 (2006) |
4 | EE | Jianping Wang,
Xiangtong Qi,
Biao Chen:
Wavelength assignment for multicast in all-optical WDM networks with splitting constraints.
IEEE/ACM Trans. Netw. 14(1): 169-182 (2006) |
2004 |
3 | EE | Jianping Wang,
Xiangtong Qi,
Mei Yang,
Biao Chen:
Exploring Core Based Tree (CBT) in WDM Networks.
ISPAN 2004: 489-494 |
2002 |
2 | | Xiangtong Qi,
Gang Yu,
Jonathan F. Bard:
Single machine scheduling with assignable due dates.
Discrete Applied Mathematics 122(1-3): 211-233 (2002) |
1999 |
1 | EE | Xiangtong Qi,
Fengsheng Tu:
Earliness and Tardiness Scheduling Problems on a Batch Processor.
Discrete Applied Mathematics 98(1-2): 131-145 (1999) |