2008 |
5 | EE | R. Maheswaran,
S. G. Ponnambalam,
N. Jawahar:
Hybrid heuristic algorithms for single machine total weighted tardiness scheduling problems.
IJISTA 4(1/2): 34-56 (2008) |
2007 |
4 | EE | A. S. Ramkumar,
S. G. Ponnambalam,
N. Jawahar:
An evolutionary search heuristic for solving QAP formulation in facility layout design.
IEEE Congress on Evolutionary Computation 2007: 4005-4011 |
3 | EE | S. Chandrasekaran,
S. G. Ponnambalam,
R. K. Suresh,
N. Vijayakumar:
Multi-objective particle swarm optimization algorithm for scheduling in flowshops to minimize makespan, total flowtime and completion time variance.
IEEE Congress on Evolutionary Computation 2007: 4012-4018 |
2004 |
2 | EE | Saravana Sankar S,
S. G. Ponnambalam:
An intelligent integrated scheduling model for Flexible Manufacturing System.
RAM 2004: 1095-1100 |
1 | EE | Ganapathy Velappa,
S. Marimuthu,
S. G. Ponnambalam:
Tabu search and simulated annealing algorithms for lot-streaming in two-machine flowshop.
SMC (5) 2004: 4221-4225 |