1990 |
6 | EE | Stephen F. Smith,
Nicola Muscettola,
Dirk C. Matthys,
Peng Si Ow,
Jean-Yves Potvin:
OPIS: An Opportunistic Factory Scheduling System.
IEA/AIE (Vol. 1) 1990: 268-274 |
5 | EE | Stephen J. Buckley,
Darcy M. Palmer,
Chae An,
James U. Korein,
Javad Ahmadi,
Peng Si Ow,
Urban Brunner:
Using the MAXX simulator for electronic card manufacturing.
Winter Simulation Conference 1990: 669-675 |
1988 |
4 | | Peng Si Ow,
Stephen F. Smith,
Alfred Thirlez:
Reactive Plan Revision.
AAAI 1988: 77-82 |
3 | EE | Michael J. Prietula,
Peng Si Ow,
Brian R. Huguenard,
Steven S. Vicinanza:
A Critiquing Model of Flexible Constraint Evaluation for a Scheduler's Workbench.
IEA/AIE (Vol. 1) 1988: 540-547 |
1986 |
2 | | Stephen F. Smith,
Mark S. Fox,
Peng Si Ow:
Constructing and Maintaining Detailed Production Plans: Investigations into the Development of Knowledge-Based Factory Scheduling Systems.
AI Magazine 7(4): 45-61 (1986) |
1985 |
1 | | Stephen F. Smith,
Peng Si Ow:
The Use of Multiple Problem Decompositions in Time Constrained Planning Tasks.
IJCAI 1985: 1013-1015 |