![]() |
| 2007 | ||
|---|---|---|
| 3 | EE | Hamed Nejad, Dongfeng Zhu, Ali Mosleh: Hierarchical planning and multi-level scheduling for simulation-based probabilistic risk assessment. Winter Simulation Conference 2007: 1189-1197 |
| 2005 | ||
| 2 | EE | Hamed Nejad: Scenario planning for simulation-based probabilistic risk assessment. Winter Simulation Conference 2005: 3 |
| 2004 | ||
| 1 | EE | Ming Li, Y. Wei, Dejan Desovski, Hamed Nejad, Sushmita Ghose, Bojan Cukic, Carol Smidts: Validation of a Methodology for Assessing Software Reliability. ISSRE 2004: 66-76 |
| 1 | Bojan Cukic | [1] |
| 2 | Dejan Desovski | [1] |
| 3 | Sushmita Ghose | [1] |
| 4 | Ming Li | [1] |
| 5 | Ali Mosleh | [3] |
| 6 | Carol Smidts | [1] |
| 7 | Y. Wei | [1] |
| 8 | Dongfeng Zhu | [3] |