2006 | ||
---|---|---|
5 | EE | D. N. P. Murthy: Product warranty and reliability. Annals OR 143(1): 133-146 (2006) |
4 | EE | J. Jaturonnatee, D. N. P. Murthy, R. Boondiskulchok: Optimal preventive maintenance of leased equipment with corrective minimal repairs. European Journal of Operational Research 174(1): 201-215 (2006) |
2005 | ||
3 | EE | C. D. Lai, Min Xie, D. N. P. Murthy: Reply to "On Some Recent Modifications of Weibull Distribution". IEEE Transactions on Reliability 54(4): 563 (2005) |
2004 | ||
2 | EE | D. N. P. Murthy, O. Solem, T. Roren: Product warranty logistics: Issues and challenges. European Journal of Operational Research 156(1): 110-126 (2004) |
2003 | ||
1 | EE | C. D. Lai, Min Xie, D. N. P. Murthy: A modified Weibull distribution. IEEE Transactions on Reliability 52(1): 33-37 (2003) |
1 | R. Boondiskulchok | [4] |
2 | J. Jaturonnatee | [4] |
3 | C. D. Lai | [1] [3] |
4 | T. Roren | [2] |
5 | O. Solem | [2] |
6 | Min Xie | [1] [3] |