![]() |
| 2003 | ||
|---|---|---|
| 2 | EE | B. Iung, G. Morel, J. B. Léger: Proactive maintenance strategy for harbour crane operation improvement. Robotica 21(3): 313-324 (2003) |
| 2001 | ||
| 1 | EE | B. Iung, E. Neunreuther, G. Morel: Engineering process of integrated - distributed shop floor architecture based on interoperable field components. Int. J. Computer Integrated Manufacturing 14(3): 246-262 (2001) |
| 1 | B. Iung | [1] [2] |
| 2 | J. B. Léger | [2] |
| 3 | E. Neunreuther | [1] |