2003 | ||
---|---|---|
2 | EE | B. Iung, G. Morel, J. B. Léger: Proactive maintenance strategy for harbour crane operation improvement. Robotica 21(3): 313-324 (2003) |
2001 | ||
1 | EE | B. Iung, E. Neunreuther, G. Morel: Engineering process of integrated - distributed shop floor architecture based on interoperable field components. Int. J. Computer Integrated Manufacturing 14(3): 246-262 (2001) |
1 | J. B. Léger | [2] |
2 | G. Morel | [1] [2] |
3 | E. Neunreuther | [1] |