2009 |
11 | EE | Jia-Ming Chen,
Wan-Chen Lu,
Wei Kuan Shih,
Ming-Chung Tang:
Imprecise Computations with Deferred Optional Tasks.
J. Inf. Sci. Eng. 25(1): 185-200 (2009) |
2008 |
10 | EE | Wan-Chen Lu,
Kwei-Jay Lin,
Hsin-Wen Wei,
Wei Kuan Shih:
Efficient Exact Test for Rate-Monotonic Schedulability Using Large Period-Dependent Initial Values.
IEEE Trans. Computers 57(5): 648-659 (2008) |
9 | EE | Hsin-Wen Wei,
Kwei-Jay Lin,
Wan-Chen Lu,
Wei Kuan Shih:
Generalized rate monotonic schedulability bounds using relative period ratios.
Inf. Process. Lett. 107(5): 142-148 (2008) |
2007 |
8 | EE | Pei-Chi Huang,
Hsin-Wen Wei,
Wan-Chen Lu,
Wei Kuan Shih,
Tsan-sheng Hsu:
Smallest Bipartite Bridge-Connectivity Augmentation (Extended Abstract).
AAIM 2007: 153-166 |
7 | EE | Wan-Chen Lu,
Kwei-Jay Lin,
Hsin-Wen Wei,
Wei Kuan Shih:
New Schedulability Conditions for Real-Time Multiframe Tasks.
ECRTS 2007: 39-50 |
6 | EE | Wan-Chen Lu,
Kwei-Jay Lin,
Hsin-Wen Wei,
Wei Kuan Shih:
Period-Dependent Initial Values for Exact Schedulability Test of Rate Monotonic Systems.
IPDPS 2007: 1-8 |
5 | EE | Wan-Chen Lu,
Kwei-Jay Lin,
Hsin-Wen Wei,
Wei Kuan Shih:
Rate monotonic schedulability tests using period-dependent conditions.
Real-Time Systems 37(2): 123-138 (2007) |
2006 |
4 | EE | Wan-Chen Lu,
Hsin-Wen Wei,
Kwei-Jay Lin:
Rate Monotonic Schedulability Conditions Using Relative Period Ratios (Abstract).
RTCSA 2006: 3-9 |
3 | EE | Wan-Chen Lu,
Jen-Wei Hsieh,
Wei Kuan Shih:
A precise schedulability test algorithm for scheduling periodic tasks in real-time systems.
SAC 2006: 1451-1455 |
2 | EE | Wan-Chen Lu,
Jen-Wei Hsieh,
Wei Kuan Shih,
Tei-Wei Kuo:
A faster exact schedulability analysis for fixed-priority scheduling.
Journal of Systems and Software 79(12): 1744-1753 (2006) |
2005 |
1 | EE | Pei-Chi Huang,
Wan-Chen Lu,
Chun-Nan Chou,
Wei Kuan Shih:
The NP-Hardness and the Algorithm for Real-Time Disk-Scheduling in a Multimedia System.
RTCSA 2005: 260-265 |