![]() | ![]() |
2007 | ||
---|---|---|
1 | EE | B. Shahul Hamid Khan, G. Prabhaharan, P. Asokan: A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness Int. J. Comput. Math. 84(12): 1731-1741 (2007) |
1 | P. Asokan | [1] |
2 | G. Prabhaharan | [1] |