2008 | ||
---|---|---|
2 | EE | P. Asokan, J. Jerald, S. Arunachalam, T. Page: Application of Adaptive Genetic Algorithm and Particle Swarm Optimisation in scheduling of jobs and AS/RS in FMS. IJMR 3(4): 393-405 (2008) |
2007 | ||
1 | EE | B. Shahul Hamid Khan, G. Prabhaharan, P. Asokan: A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness Int. J. Comput. Math. 84(12): 1731-1741 (2007) |
1 | S. Arunachalam | [2] |
2 | J. Jerald | [2] |
3 | B. Shahul Hamid Khan | [1] |
4 | T. Page | [2] |
5 | G. Prabhaharan | [1] |