2003 | ||
---|---|---|
5 | Roger M. Kerr, Gang Wu: Use Of Gaming And Simulation To Study Self-Organising Behaviour Of Virtual Enterprises. PRO-VE 2003: 415-422 | |
1994 | ||
4 | Elizabeth Szelke, Roger M. Kerr: Knowledge-Based Reactive Scheduling, Proceedings of the IFIP TC5/WG5.7 International Workshop on Knowledge-Based Reactive Scheduling, Athens, Greec, 1 October, 1993 North-Holland 1994 | |
1993 | ||
3 | Roger M. Kerr: Fuzzy Scheduling Systems. FLAI 1993: 192 | |
2 | Roger M. Kerr, Elizabeth Szelke: Open Discussion - A Summary. Knowledge-Based Reactive Scheduling 1993: 163-164 | |
1992 | ||
1 | EE | Roger M. Kerr: Expert systems in production scheduling: Lessons from a failed implementation. Journal of Systems and Software 19(2): 123-130 (1992) |
1 | Elizabeth Szelke | [2] [4] |
2 | Gang Wu | [5] |