2007 | ||
---|---|---|
6 | EE | Byung-Cheon Choi, Suk-Hun Yoon, Sung-Jin Chung: Single machine scheduling problems with resource dependent release times. Computers & OR 34(7): 1988-2000 (2007) |
5 | EE | Byung-Cheon Choi, Suk-Hun Yoon, Sung-Jin Chung: Minimizing maximum completion time in a proportionate flow shop with one machine of different speed. European Journal of Operational Research 176(2): 964-974 (2007) |
4 | EE | Byung-Cheon Choi, Suk-Hun Yoon, Sung-Jin Chung: Single machine scheduling problem with controllable processing times and resource dependent release times. European Journal of Operational Research 181(2): 645-653 (2007) |
3 | EE | Sung-Pil Hong, Byung-Cheon Choi: Approximability of the k-server disconnection problem. Networks 50(4): 273-282 (2007) |
2 | EE | Sung-Pil Hong, Byung-Cheon Choi: Polynomiality of sparsest cuts with fixed number of sources. Oper. Res. Lett. 35(6): 739-742 (2007) |
2006 | ||
1 | EE | Byung-Cheon Choi, Sung-Pil Hong: Two-Server Network Disconnection Problem. ICCSA (3) 2006: 785-792 |
1 | Sung-Jin Chung | [4] [5] [6] |
2 | Sung-Pil Hong | [1] [2] [3] |
3 | Suk-Hun Yoon | [4] [5] [6] |