2007 | ||
---|---|---|
6 | EE | Radu F. Babiceanu, F. Frank Chen: Manufacturing scheduling in decentralised holonic systems using artificial intelligence techniques. IJMTM 11(3/4): 389-410 (2007) |
2006 | ||
5 | EE | Hosang Jung, F. Frank Chen: Evolutionary Algorithm Based Corrective Process Control System in Glass Melting Process. EMO 2006: 472-485 |
4 | EE | Dongwon Kim, Dong-Gil Na, Wooseung Jang, F. Frank Chen: Simulated annealing and genetic algorithm for unrelated parallel machine scheduling considering set-up times. IJCAT 26(1/2): 28-36 (2006) |
2005 | ||
3 | EE | Radu F. Babiceanu, F. Frank Chen: Performance evaluation of agent-based material handling systems using simulation techniques. Winter Simulation Conference 2005: 1022-1028 |
2 | EE | Ming Dong, F. Frank Chen: Performance modeling and analysis of integrated logistic chains: An analytic framework. European Journal of Operational Research 162(1): 83-98 (2005) |
2000 | ||
1 | EE | F. Frank Chen, Can Saygin: A laboratory infrastructure for flexible automation and integrated manufacturing research. IJMTM 1(2/3): 173-184 (2000) |
1 | Radu F. Babiceanu | [3] [6] |
2 | Ming Dong | [2] |
3 | Wooseung Jang | [4] |
4 | Hosang Jung | [5] |
5 | Dongwon Kim | [4] |
6 | Dong-Gil Na | [4] |
7 | Can Saygin | [1] |