![]() | ![]() |
2008 | ||
---|---|---|
6 | EE | Yu Xia, Bintong Chen, Jinfeng Yue: Job sequencing and due date assignment in a single machine shop with uncertain processing times. European Journal of Operational Research 184(1): 63-75 (2008) |
2007 | ||
5 | EE | Jinfeng Yue, Min-Chiang Wang, Bintong Chen: Mean-range based distribution-free procedures to minimize "overage" and "underage" costs. European Journal of Operational Research 176(2): 1103-1116 (2007) |
2005 | ||
4 | EE | Yu Xia, Bintong Chen, Jinfeng Yue: Sequence Jobs and Assign Due Dates with Uncertain Processing Times and Quadratic Penalty Functions. AAIM 2005: 261-269 |
1998 | ||
3 | EE | Bintong Chen, Chin-Shien Lin: Minmax-regret robust 1-median location on a tree. Networks 31(2): 93-103 (1998) |
1996 | ||
2 | EE | Bintong Chen, Bharatendu Srivastava: An Improved Lower Bound for the Bin Packing Problem. Discrete Applied Mathematics 66(1): 81-94 (1996) |
1995 | ||
1 | Bintong Chen, Patrick T. Harker: A continuation method for monotone variational inequalities. Math. Program. 69: 237-253 (1995) |
1 | Patrick T. Harker | [1] |
2 | Chin-Shien Lin | [3] |
3 | Bharatendu Srivastava | [2] |
4 | Min-Chiang Wang | [5] |
5 | Yu Xia | [4] [6] |
6 | Jinfeng Yue | [4] [5] [6] |