2007 |
12 | EE | Xiaobing Gan,
Yanhong Gu,
George L. Vairaktarakis,
Xiaoqiang Cai,
Quanle Chen:
A Scheduling Problem with One Producer and the Bargaining Counterpart with Two Producers.
ESCAPE 2007: 305-316 |
11 | EE | Xiaolin Xu,
Xiaoqiang Cai,
Chunlin Liu,
Chikit To:
Optimal Commodity Distribution for a Vehicle with Fixed Capacity Under Vendor Managed Inventory.
ESCAPE 2007: 329-339 |
10 | EE | Yongjian Li,
Jian Chen,
Xiaoqiang Cai:
An integrated staff-sizing approach considering feasibility of scheduling decision.
Annals OR 155(1): 361-390 (2007) |
9 | EE | Xiaoqiang Cai,
Xianyi Wu,
Xian Zhou:
Single-machine scheduling with general costs under compound-type distributions.
J. Scheduling 10(1): 77-84 (2007) |
2006 |
8 | EE | Quanle Chen,
Xiaoqiang Cai,
Yanhong Gu:
An Optimization Problem on Two-Partition of Jobs for Profit Allocation.
APCCAS 2006: 626-629 |
7 | EE | Xiaoqiang Cai,
Yongjian Li,
Fengsheng Tu:
Maximizing Dual Function by Genetic Algorithm - A New Approach for Optimal Manpower Planning.
ICIC (2) 2006: 1147-1157 |
2005 |
6 | EE | Yongjian Li,
Jian Chen,
Xiaoqiang Cai,
Fengsheng Tu:
Optimal Manpower Planning with Temporal Labor and Contract Period Constraints.
AAIM 2005: 350-359 |
5 | EE | Kok Lay Teo,
T. C. Edwin Cheng,
Xiaoqiang Cai,
Xiaoqi Yang:
Preface.
Annals OR 133(1-4): 17-20 (2005) |
2004 |
4 | EE | Xiaoqiang Cai,
Xiaolin Xu,
Xian Zhou:
Optimal production decisions under an uncertain deadline.
SMC (7) 2004: 6009-6014 |
3 | EE | Yongjian Li,
Xiaoqiang Cai,
Fengsheng Tu,
Xiuli Shao:
Optimization of tandem queue systems with finite buffers.
Computers & OR 31(6): 963-984 (2004) |
2000 |
2 | EE | Guochuan Zhang,
Xiaoqiang Cai,
C. K. Wong:
Linear time-approximation algorithms for bin packing.
Oper. Res. Lett. 26(5): 217-222 (2000) |
1998 |
1 | EE | Xiaoqiang Cai,
T. C. Edwin Cheng:
Multi-machine Scheduling with Variance Minimization.
Discrete Applied Mathematics 84(1-3): 55-70 (1998) |