2008 |
4 | EE | Tay Jin Chua,
Tian Xiang Cai,
Joyce Mei Wan Low:
Dynamic operations and manpower scheduling for high-mix, low-volume manufacturing.
ETFA 2008: 54-57 |
2006 |
3 | EE | Tay Jin Chua,
F. Y. Wang,
Tian Xiang Cai,
Xiao-Feng Yin:
A Heuristics-based Advanced Planning and Scheduling System with Bottleneck Scheduling Algorithm.
ETFA 2006: 240-247 |
2004 |
2 | EE | Xiao-Feng Yin,
Tay Jin Chua,
Feng-Yu Wang,
Ming-Wei Liu,
Tian Xiang Cai,
Wen-Jing Yan,
Chin-Soon Chong,
Ju-Ping Zhu,
Mei-Yoke Lam:
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly.
Int. J. Computer Integrated Manufacturing 17(8): 733-749 (2004) |
2002 |
1 | EE | William Liu,
Tay Jin Chua,
J. Larn,
Feng-Yu Wang,
Tian Xiang Cai,
X. F. Yin:
APS, ERP and MES systems integration for semiconductor backend assembly.
ICARCV 2002: 1403-1408 |