| 2008 |
| 12 | EE | Mounira Tlili,
Mohamed Moalla,
Pierre Baptiste:
Application of a Cutting/Packing Method for Solving a Job Scheduling Problem in a Line of Machines.
Journal of Decision Systems 17(3): 387-401 (2008) |
| 2006 |
| 11 | EE | David Jégou,
Dae-Won Kim,
Pierre Baptiste,
Kwang Hyung Lee:
A contract net based intelligent agent system for solving the reactive hoist scheduling problem.
Expert Syst. Appl. 30(2): 156-167 (2006) |
| 2005 |
| 10 | EE | Nour El Houda Saadani,
Pierre Baptiste,
Mohamed Moalla:
The simple F.
European Journal of Operational Research 161(1): 21-31 (2005) |
| 2001 |
| 9 | | Kwang H. Lee,
David Jégou,
Pierre Baptiste:
Multiagent Systems for the Hoist Scheduling Problem.
FUZZ-IEEE 2001: 581-585 |
| 2000 |
| 8 | EE | Brigitte Chebel-Morello,
E. Lereno,
Pierre Baptiste:
A New Algorithm to Select Learning Examples from Learning Data.
IDEAL 2000: 71-77 |
| 1999 |
| 7 | | Z. Bahroun,
Pierre Baptiste,
J. P. Campagne,
Mohamed Moalla:
Short term production management in the context of cyclic delivery schedules.
APMS 1999: 34-42 |
| 6 | | Delphine Michaut,
Pierre Baptiste:
Selection of a Relevant Feature Subset for Induction Tasks.
ISMIS 1999: 466-474 |
| 5 | | Christophe Lang,
Michel Trehel,
Pierre Baptiste:
A Distributed Placement Algorithm Based on Process Initiative and on a Limited Travel.
PDPTA 1999: 2636-2641 |
| 4 | EE | Christophe Lang,
Michel Trehel,
Pierre Baptiste:
PLATINUM: A Placement Tool Based on Process Initiative.
PaCT 1999: 503-508 |
| 1995 |
| 3 | | Christophe Varnier,
Pierre Baptiste,
Bruno Legeard:
Outil d'aide à l'élaboration d'ordonnancement cyclique pour les lignes de traitement de surface.
JFPLC 1995: 365-368 |
| 1994 |
| 2 | | Pierre Baptiste,
Bruno Legeard,
Hamza Zidoum:
Sequences Constraint Solving in Constraints Logic Programming.
ICTAI 1994: 804-807 |
| 1993 |
| 1 | | Christophe Varnier,
Pierre Baptiste,
Bruno Legeard:
Le traitement des contraintes disjonctives dans un problème d'ordonnancement : exemple du «Hoist Scheduling Problem».
JFPL 1993: 343-363 |