dblp.uni-trier.dewww.uni-trier.de

Vinícius Amaral Armentano

List of publications from the DBLP Bibliography Server - FAQ
Coauthor Index - Ask others: ACM DL/Guide - CiteSeer - CSB - Google - MSN - Yahoo

2007
12EEVinícius Amaral Armentano, Moacir Felizardo de França Filho: Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach. European Journal of Operational Research 183(1): 100-114 (2007)
11EEDenise Sato Yamashita, Vinícius Amaral Armentano, Manuel Laguna: Robust optimization models for project scheduling with resource availability cost. J. Scheduling 10(1): 67-76 (2007)
2006
10EEDenise Sato Yamashita, Vinícius Amaral Armentano, Manuel Laguna: Scatter search for project scheduling with resource availability cost. European Journal of Operational Research 169(2): 623-637 (2006)
9EEFranklina Maria Bragion Toledo, Vinícius Amaral Armentano: A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines. European Journal of Operational Research 175(2): 1070-1083 (2006)
8EEVinícius Amaral Armentano, Olinto César Bassi de Araujo: Grasp with memory-based mechanisms for minimizing total tardiness in single machine scheduling with setup times. J. Heuristics 12(6): 427-446 (2006)
2005
7EEJosé Elias Claudio Arroyo, Vinícius Amaral Armentano: Genetic local search for multi-objective flowshop scheduling problems. European Journal of Operational Research 167(3): 717-738 (2005)
2004
6EEVinícius Amaral Armentano, José Elias Claudio Arroyo: An Application of a Multi-Objective Tabu Search Algorithm to a Bicriteria Flowshop Problem. J. Heuristics 10(5): 463-481 (2004)
1999
5EEVinícius Amaral Armentano, Débora P. Ronconi: Tabu search for total tardiness minimization in flowshop scheduling problems. Computers & OR 26(3): 219-235 (1999)
1997
4EEPaulo M. França, Vinícius Amaral Armentano, Regina Berretta, Alistair Richard Clark: A heuristic method for lot-sizing in multi-stage systems. Computers & OR 24(9): 861-874 (1997)
1995
3EEAlistair Richard Clark, Vinícius Amaral Armentano: The application of valid inequalities to the multi-stage lot-sizing problem. Computers & OR 22(7): 669-680 (1995)
1994
2 X.-B. Wu, Vinícius Amaral Armentano: Analytic Process of State and its Application in FMS Scheduling. Production Management Methods 1994: 271-278
1992
1 X.-B. Wu, Vinícius Amaral Armentano: Scheduling and Control of AGV Based Material Handling Systems. PROLAMAT 1992: 729-736

Coauthor Index

1Olinto César Bassi de Araujo [8]
2José Elias Claudio Arroyo [6] [7]
3Regina Berretta [4]
4Alistair Richard Clark [3] [4]
5Moacir Felizardo de França Filho [12]
6Paulo M. França [4]
7Manuel Laguna [10] [11]
8Débora P. Ronconi [5]
9Franklina Maria Bragion Toledo [9]
10X.-B. Wu [1] [2]
11Denise Sato Yamashita [10] [11]

Colors in the list of coauthors

Copyright © Sun May 17 03:24:02 2009 by Michael Ley (ley@uni-trier.de)