2008 |
5 | EE | Cristóbal Miralles,
José Pedro García-Sabater,
Carlos Andrés,
Manuel Cardós:
Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled.
Discrete Applied Mathematics 156(3): 352-367 (2008) |
4 | EE | Carlos Andrés,
Cristóbal Miralles,
Rafael Pastor:
Balancing and scheduling tasks in assembly lines with sequence-dependent setup times.
European Journal of Operational Research 187(3): 1212-1223 (2008) |
2006 |
3 | EE | Carlos Andrés,
Pedro Gomez,
José Pedro García-Sabater:
Comparing dispatching rules in dynamic hybrid flow shops.
ETFA 2006: 233-239 |
2005 |
2 | EE | Carlos Andrés,
José Miguel Albarracín,
Guillermina Tormo,
Eduardo Vicens,
José Pedro García-Sabater:
Group technology in a hybrid flowshop environment: A case study.
European Journal of Operational Research 167(1): 272-281 (2005) |
2002 |
1 | | Carlos Andrés:
Scheduling in Hybrid Flowshops with Sequence Dependent Setup Times. A MILP Model and a Simulated Annealing Based Approach.
IC-AI 2002: 245-249 |