2005 |
6 | EE | R. Al-Omari,
Arun K. Somani,
G. Manimaran:
An adaptive scheme for fault-tolerant scheduling of soft real-time tasks in multiprocessor systems.
J. Parallel Distrib. Comput. 65(5): 595-608 (2005) |
2004 |
5 | EE | R. Al-Omari,
Arun K. Somani,
G. Manimaran:
Efficient overloading techniques for primary-backup scheduling in real-time systems.
J. Parallel Distrib. Comput. 64(5): 629-648 (2004) |
2003 |
4 | EE | R. Al-Omari,
G. Manimaran,
M. V. Salapaka,
Arun K. Somani:
Novel Algorithms for Open-Loop and Closed-Loop Scheduling of Real-Time Tasks in Multiprocessor Systems Based on Execution Time Estimation.
IPDPS 2003: 7 |
2001 |
3 | EE | R. Al-Omari,
Arun K. Somani,
G. Manimaran:
An Adaptive Scheme for Fault-Tolerant Scheduling of Soft Real-Time Tasks in Multiprocessor Systems.
HiPC 2001: 68-80 |
2 | | R. Al-Omari,
Arun K. Somani,
G. Manimaran:
A New Fault-Tolerant Technique for Improving the Schedulability in Multiprocessor Real-time Systems.
IPDPS 2001: 32 |
2000 |
1 | EE | R. Al-Omari,
G. Manimaran,
Arun K. Somani:
An Efficient Backup-Overloading for Fault-Tolerant Scheduling of Real-Time Tasks.
IPDPS Workshops 2000: 1291-1295 |