1999 |
14 | | Kishore Sengupta,
Tarek K. Abdel-Hamid,
M. Bosley:
Coping with staffing delays in software project management: an experimental investigation.
IEEE Transactions on Systems, Man, and Cybernetics, Part A 29(1): 77-91 (1999) |
13 | EE | Tarek K. Abdel-Hamid,
Kishore Sengupta,
Clint Swett:
The Impact of Goals On Software Project Management: An Experimental Investigation.
MIS Quarterly 23(4): (1999) |
1997 |
12 | EE | Chi Y. Lin,
Tarek K. Abdel-Hamid,
Joseph S. Sherif:
Software-Engineering Process Simulation model (SEPS).
Journal of Systems and Software 38(3): 263-277 (1997) |
1996 |
11 | EE | Tarek K. Abdel-Hamid:
The Slippery Path to Productivity Improvement.
IEEE Software 13(4): 43-52 (1996) |
1993 |
10 | | Tarek K. Abdel-Hamid:
Adapting, Correcting, and Perfecting Software Estimates: A Maintenance Metaphor.
IEEE Computer 26(3): 20-29 (1993) |
9 | EE | Tarek K. Abdel-Hamid,
Kishore Sengupta,
Daniel Ronan:
Software Project Control: An Experimental Investigation of Judgment with Fallible Information.
IEEE Trans. Software Eng. 19(6): 603-612 (1993) |
8 | EE | Tarek K. Abdel-Hamid:
A multiproject perspective of single-project dynamics.
Journal of Systems and Software 22(3): 151-165 (1993) |
1990 |
7 | | Tarek K. Abdel-Hamid:
Investigating the Cost/Schedule Trade-Off in Software Development.
IEEE Software 7(1): 97-105 (1990) |
6 | EE | Tarek K. Abdel-Hamid:
On the utility of historical project statistics for cost and schedule estimation: Results from a simulation-based case study.
Journal of Systems and Software 13(1): 71-82 (1990) |
1989 |
5 | | Tarek K. Abdel-Hamid,
Stuart E. Madnick:
Lessons Learned from Modeling the Dynamics of Software Development.
Commun. ACM 32(12): 1426-1438, 1455 (1989) |
4 | EE | Tarek K. Abdel-Hamid:
The Dynamics of Software Project Staffing: A System Dynamics Based Simulation Approach.
IEEE Trans. Software Eng. 15(2): 109-119 (1989) |
1988 |
3 | EE | Tarek K. Abdel-Hamid:
Understanding the "90% syndrome" in software project management: A simulation-based case study.
Journal of Systems and Software 8(4): 319-330 (1988) |
1983 |
2 | | Tarek K. Abdel-Hamid,
Stuart E. Madnick:
The Dynamics of Software Project Scheduling.
Commun. ACM 26(5): 340-346 (1983) |
1980 |
1 | | Hoo-Min D. Toong,
Svein O. Strommen,
Earl R. Goodrich II,
John F. Buford,
Tarek K. Abdel-Hamid,
J.-F. Mergen:
Parallel Processing Capabilities of Advanced 16-Bit Microprocessors.
ACM Pacific 1980: 130-141 |