2005 | ||
---|---|---|
8 | EE | Chung Keung Poon, Wenci Yu: A Flexible On-line Scheduling Algorithm for Batch Machine with Infinite Capacity. Annals OR 133(1-4): 175-181 (2005) |
7 | EE | Chung Keung Poon, Wenci Yu: On-Line Scheduling Algorithms for a Batch Machine with Finite Capacity. J. Comb. Optim. 9(2): 167-186 (2005) |
2004 | ||
6 | EE | Chung Keung Poon, Wenci Yu: On Minimizing Total Completion Time In Batch Machine Scheduling. Int. J. Found. Comput. Sci. 15(4): 593-607 (2004) |
5 | EE | Wenci Yu, Han Hoogeveen, Jan Karel Lenstra: Minimizing Makespan in a Two-Machine Flow Shop with Delays and Unit-Time Operations is NP-Hard. J. Scheduling 7(5): 333-348 (2004) |
2000 | ||
4 | Zhaohui Liu, Wenci Yu: Scheduling one batch processor subject to job release dates. Discrete Applied Mathematics 105(1-3): 129-136 (2000) | |
1999 | ||
3 | EE | Zhaohui Liu, Wenci Yu, T. C. Edwin Cheng: Scheduling Groups of Unit Length Jobs on Two Identical Parallel Machines. Inf. Process. Lett. 69(6): 275-281 (1999) |
2 | Zhaohui Liu, Wenci Yu: Minimizing the Number of Late Jobs under the Group Technology Assumption. J. Comb. Optim. 3(1): 5-15 (1999) | |
1996 | ||
1 | EE | Wenci Yu: Augmentations of Consistent Partial orders for the one-machine Total Tardiness Problem. Discrete Applied Mathematics 68(1-2): 189-202 (1996) |
1 | T. C. Edwin Cheng | [3] |
2 | Han Hoogeveen (J. A. Hoogeveen) | [5] |
3 | Jan Karel Lenstra | [5] |
4 | Zhaohui Liu | [2] [3] [4] |
5 | Chung Keung Poon | [6] [7] [8] |