![]() | ![]() |
2008 | ||
---|---|---|
4 | EE | Masao Yokoyama: Flow-shop scheduling with setup and assembly operations. European Journal of Operational Research 187(3): 1184-1195 (2008) |
2005 | ||
3 | EE | Masao Yokoyama, Daryl L. Santos: Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times. European Journal of Operational Research 161(3): 754-770 (2005) |
2004 | ||
2 | EE | Masao Yokoyama: Scheduling for two-stage production system with setup and assembly operations. Computers & OR 31(12): 2063-2078 (2004) |
2003 | ||
1 | EE | Masao Yokoyama, Harold W. Lewis III: Optimization of the stochastic dynamic production cycling problem by a genetic algorithm. Computers & OR 30(12): 1831-1849 (2003) |
1 | Harold W. Lewis III | [1] |
2 | Daryl L. Santos | [3] |