| 2006 | 
| 9 | EE | Cixing Lv,
Zhongqi Sheng,
Sufen Li,
Chaowan Yin,
Yunlong Zhu:
A Kind of Adaptive Negotiation Mechanism for Flexible Job Shop Scheduling.
ICIC (2) 2006: 324-333 | 
| 2005 | 
| 8 | EE | Cixing Lv,
Yunlong Zhu,
Chaowan Yin:
Resource Allocation Based on Combinatorial Auction in E-manufacturing Environment.
CIT 2005: 983-988 | 
| 7 | EE | Fu-ming Li,
Yunlong Zhu,
Chaowan Yin,
Xiao-yu Song:
Fuzzy Programming for Multiobjective Fuzzy Job Shop Scheduling with Alternative Machines Through Genetic Algorithms.
ICNC (2) 2005: 992-1004 | 
| 6 | EE | Cixing Lv,
Yunlong Zhu,
Chaowan Yin:
A Kind of Negotiation Policy for Resource Allocation in Distributed Manufacturing Environment.
PDCAT 2005: 876-879 | 
| 2004 | 
| 5 |   | Mingxu Ma,
Haiyue Li,
Wenlei Zhang,
Chaowan Yin,
Chengen Wang:
The Research of Product Graphical Information Sharing Technology of Virtual Manufacturing Enterprise in E-commerce Environment.
ICEB 2004: 713-717 | 
| 2002 | 
| 4 | EE | Chengen Wang,
Yu Zhang,
Guoning Song,
Chaowan Yin,
Chengbin Chu:
An integration architecture for process manufacturing systems.
Int. J. Computer Integrated Manufacturing 15(5): 413-426 (2002) | 
| 1999 | 
| 3 | EE | Wen Chen,
Yengchai Soh,
Chaowan Yin:
Technical note Iterative learning control for constrained nonlinear systems.
Int. J. Systems Science 30(6): 659-664 (1999) | 
| 1997 | 
| 2 | EE | Wen Chen,
Huaguang Zhang,
Chaowan Yin:
Input/output Linearization for Nonlinear Systems with Uncertainties and Disturbances Using Tdc.
Cybernetics and Systems 28(7): 625-634 (1997) | 
| 1991 | 
| 1 |   | Sen Wang,
Chaowan Yin,
Hui Peng:
The Application Level Services Protocol Requirements in the Heterogeneous Environment of CIM.
ITAMS 1991: 117-124 |