| 2009 |
| 3 | EE | Yan Cao,
Jiang Du,
Yu Bai,
Lina Yang,
Yanli Yang:
Multi-layer Intelligent Encapsulation of Manufacturing Resources for MAS-based Distributed Manufacturing System.
WKDD 2009: 905-908 |
| 2008 |
| 2 | EE | Yan Cao,
Yanli Yang,
Huamin Wang:
Integrated Routing Wasp Algorithm and Scheduling Wasp Algorithm for Job Shop Dynamic Scheduling.
ISECS 2008: 674-678 |
| 1 | EE | Yan Cao,
Yanli Yang,
Lina Yang:
Dynamic Scheduling and Control System Based on Multi-layer Mixed Construction of Manufacturing Resource Agents.
ISIP 2008: 247-251 |