2009 |
10 | EE | Xiuli Wang:
Comment on "Language Trees and Zipping"
CoRR abs/0903.3669: (2009) |
9 | EE | Xiuli Wang,
T. C. Edwin Cheng:
Production scheduling with supply and delivery considerations to minimize the makespan.
European Journal of Operational Research 194(3): 743-752 (2009) |
2007 |
8 | EE | Xiuli Wang,
T. C. Edwin Cheng:
Heuristics for two-machine flowshop scheduling with setup times and an availability constraint.
Computers & OR 34(1): 152-162 (2007) |
7 | EE | Xiuli Wang,
T. C. Edwin Cheng:
An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraint.
Computers & OR 34(10): 2894-2901 (2007) |
6 | EE | Xiuli Wang,
T. C. Edwin Cheng:
Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan.
European Journal of Operational Research 178(1): 57-70 (2007) |
2006 |
5 | EE | Jianxue Wang,
Weichao Wang,
Xifan Wang,
Haoyong Chen,
Xiuli Wang:
Cooperative Co-evolutionary Approach Applied in Reactive Power Optimization of Power System.
ICNC (1) 2006: 620-628 |
4 | EE | Xiuli Wang,
Yongji Wang,
Hui Zhou:
QSCM: Engineering QoS in Web-Based Software Configuration Management System.
Web Intelligence 2006: 1050-1056 |
3 | EE | Xiuli Wang,
T. C. Edwin Cheng:
A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups.
Computers & OR 33: 1326-1344 (2006) |
2005 |
2 | EE | Xiuli Wang,
T. C. Edwin Cheng:
Two-machine flowshop scheduling with job class setups to minimize total flowtime.
Computers & OR 32: 2751-2770 (2005) |
1 | EE | Xiuli Wang,
T. C. Edwin Cheng:
Single machine scheduling with resource dependent release times and processing times.
European Journal of Operational Research 162(3): 727-739 (2005) |