2009 | ||
---|---|---|
1 | EE | Bin Qian, Ling Wang, Dexian Huang, Wan-liang Wang, Xiong Wang: An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers. Computers & OR 36(1): 209-233 (2009) |
1 | Dexian Huang | [1] |
2 | Bin Qian | [1] |
3 | Ling Wang | [1] |
4 | Xiong Wang | [1] |