2006 | ||
---|---|---|
2 | EE | Karl W. Wagner, Walter Durr: A Five-Step Method for Value-Based Planning and Monitoring of Systems Engineering Projects. EUROMICRO-SEAA 2006: 282-290 |
2005 | ||
1 | EE | Karl W. Wagner, Walter Durr: Design failure cost as a measure of a process measurement system (a method for building the system and evaluating the measure). EUROMICRO-SEAA 2005: 214-221 |
1 | Walter Durr | [1] [2] |