| 2009 |
| 8 | EE | Lee Kee Goh,
Bharadwaj Veeravalli,
Sivakumar Viswanathan:
Design of Fast and Efficient Energy-Aware Gradient-Based Scheduling Algorithms Heterogeneous Embedded Multiprocessor Systems.
IEEE Trans. Parallel Distrib. Syst. 20(1): 1-12 (2009) |
| 2007 |
| 7 | EE | Lee Kee Goh,
Bharadwaj Veeravalli,
Sivakumar Viswanathan:
An Energy-Aware Gradient-Based Scheduling Heuristic for Heterogeneous Multiprocessor Embedded Systems.
HiPC 2007: 331-341 |
| 6 | EE | Yanhong Liu,
Bharadwaj Veeravalli,
Sivakumar Viswanathan:
Novel critical-path based low-energy scheduling algorithms for heterogeneous multiprocessor real-time embedded systems.
ICPADS 2007: 1-8 |
| 5 | EE | Yanhong Liu,
Bharadwaj Veeravalli,
Sivakumar Viswanathan:
Critical-Path based Low-Energy Scheduling Algorithms for Body Area Network Systems.
RTCSA 2007: 301-308 |
| 4 | EE | Sivakumar Viswanathan,
Bharadwaj Veeravalli,
Thomas G. Robertazzi:
Resource-Aware Distributed Scheduling Strategies for Large-Scale Computational Cluster/Grid Systems.
IEEE Trans. Parallel Distrib. Syst. 18(10): 1450-1461 (2007) |
| 2004 |
| 3 | EE | Sivakumar Viswanathan,
Bharadwaj Veeravalli,
Dantong Yu,
Thomas G. Robertazzi:
Design and Analysis of a Dynamic Scheduling Strategy with Resource Estimation for Large-Scale Grid Systems.
GRID 2004: 163-170 |
| 2001 |
| 2 | | Deepak Agrawal,
Sreedhar T. Bharath,
Sivakumar Viswanathan:
Surging Volatility: An Internet Effect?
ICIS 2001: 497-502 |
| 2000 |
| 1 | EE | Sivakumar Viswanathan:
Competition across channels: do electronic markets complement or cannibalize traditional retailers.
ICIS 2000: 513-519 |