2007 |
8 | EE | John-Michael Wong,
Kristen Parrish,
Iris D. Tommelein,
Bozidar Stojadinovic:
Communication and process simulation of set-based design for concrete reinforcement.
Winter Simulation Conference 2007: 2057-2065 |
2003 |
7 | EE | Jan A. Elfving,
Iris D. Tommelein:
Construction engineering and project management II: impact of multitasking and merge bias on procurement of complex equipment.
Winter Simulation Conference 2003: 1527-1533 |
2002 |
6 | EE | Kenneth D. Walsh,
Tobi A. Walsh,
James C. Hershauer,
Iris D. Tommelein,
Anil Sawhney:
CEPM 3: lead time reduction via pre-positioning of inventory in an industrial construction supply chain.
Winter Simulation Conference 2002: 1737-1744 |
5 | EE | Roberto J. Arbulu,
Iris D. Tommelein,
Kenneth D. Walsh,
James C. Hershauer:
CEPM 3: contributors to lead time in construction supply chains: case of pipe supports used in power plants.
Winter Simulation Conference 2002: 1745-1751 |
2001 |
4 | EE | Nuno Gil,
Iris D. Tommelein:
Comparison of simulation modeling techniques that use preemption to capture design uncertainty.
Winter Simulation Conference 2001: 1504-1511 |
3 | EE | Nuno Gil,
Iris D. Tommelein,
Robert Kirkendall:
Extreme modeling: modeling design development in unpredictable environments.
Winter Simulation Conference 2001: 515-522 |
1999 |
2 | EE | Iris D. Tommelein:
Travel-time simulation to locate and staff temporary facilities under changing construction demand.
Winter Simulation Conference 1999: 978-984 |
1994 |
1 | EE | Iris D. Tommelein,
Robert I. Carr,
Abdalla M. Odeh:
Knowledge-based assembly of simulation networks using construction designs, plans, and methods.
Winter Simulation Conference 1994: 1145-1152 |