1998 |
6 | | Joseph Y.-T. Leung,
Tommy W. Tam,
C. S. Wong,
Gilbert H. Young:
Minimizing Mean Flow Time with Error Constraint.
Algorithmica 20(1): 101-118 (1998) |
1996 |
5 | | Joseph Y.-T. Leung,
Tommy W. Tam,
Gilbert H. Young:
On-Line Routing of Real-Time Messages.
J. Parallel Distrib. Comput. 34(2): 211-217 (1996) |
1995 |
4 | EE | Joseph Y.-T. Leung,
Tommy W. Tam,
C. S. Wong,
Gilbert H. Young:
Routing Messages with Release Time and Deadline Constraint.
J. Parallel Distrib. Comput. 31(1): 65-76 (1995) |
1990 |
3 | | Joseph Y.-T. Leung,
Tommy W. Tam,
Gilbert H. Young:
On-Line Routing of Real-Time Messages.
IEEE Real-Time Systems Symposium 1990: 126-135 |
2 | | Joseph Y.-T. Leung,
Tommy W. Tam,
C. S. Wong,
Gilbert H. Young,
Francis Y. L. Chin:
Packing Squares into a Square.
J. Parallel Distrib. Comput. 10(3): 271-275 (1990) |
1989 |
1 | | Joseph Y.-T. Leung,
Tommy W. Tam,
C. S. Wong,
G. H. Wong:
Minimizing Mean Flow Time with Error Constraint.
IEEE Real-Time Systems Symposium 1989: 2-11 |