2006 | ||
---|---|---|
4 | EE | C. M. Tam, Thomas K. L. Tong, Gerald W. C. Chiu: Comparing non-structural fuzzy decision support system and analytical hierarchy process in decision-making for construction problems. European Journal of Operational Research 174(2): 1317-1324 (2006) |
2005 | ||
3 | EE | Hong Zhang, C. M. Tam, Heng Li: Modeling uncertain activity duration by fuzzy number and discrete-event simulation. European Journal of Operational Research 164(3): 715-729 (2005) |
2004 | ||
2 | Hong Zhang, C. M. Tam: Fuzzy simulation of flexible construction processes. IJCAT 20(1-3): 15-25 (2004) | |
1998 | ||
1 | EE | Jonathan Jinsheng Shi, S. X. Zeng, C. M. Tam: Modeling and Simulation of Public Housing Construction in Hong Kong. Winter Simulation Conference 1998: 1305-1310 |
1 | Gerald W. C. Chiu | [4] |
2 | Heng Li | [3] |
3 | Jonathan Jinsheng Shi | [1] |
4 | Thomas K. L. Tong | [4] |
5 | S. X. Zeng | [1] |
6 | Hong Zhang | [2] [3] |